Let’s discuss your energy challenge.
Tell us your required steam pressure, hourly demand, operating schedule and site location. We can start with a technical discussion.
Tell us about your project
Send a short inquiry. Technical details are optional.
Email our team
For project inquiries, please include your organization and project location.
Inquiry: Waste-to-energy & biomass
thermonova@hotmail.com ↗Using webmail? Copy the address to compose your message.
U.S. office
41-80 Main Street, Suite B4, Flushing, NY 11355
Start with the process.
A useful first exchange includes a recent steam load profile, current fuel and electricity prices, and the available space for integration.
- Project location and industry
- Steam pressure, temperature and hourly demand
- Operating schedule and current energy prices
- Existing boilers, power supply and available space
Before we design your system.
Do we need to replace our existing boiler?+
Thermal storage can operate alongside an existing boiler. Integration design determines load sharing, backup supply and operating continuity.
What determines project economics?+
Electricity and fuel tariffs, demand charges, operating hours, grid capacity, equipment cost and maintenance all matter. A site-specific comparison comes first.
What should we prepare?+
Share your site location, steam pressure and temperature, hourly demand, operating schedule and energy prices. For electrical storage, include load and renewable generation profiles.
